IP3 will be requalified.
        Portugal
        
            
	According to the report, the Government will move forward with the requalification of the IP3.
	 
	 
	 
	In a first phase, this section will have a highway profile in 85 percent of its route, without tolls. This requalification will be carried out as follows:
	 
	- 
		Four lanes (2 + 2) in 85 percent of the route;
- 
		Three lanes (2 + 1) at 12 percent of the route;
- 
		Two tracks (1 + 1) at 3 percent of the way.