Traffic conditions in Guipúzcoa and Navarra
        Portugal
        
            
	Guipúscoa: Works in the tunnel of San Lorenzo in A-15
	 
	According to our Basque counterpart, we inform you that during the construction of the San Lorenzo-A15 tunnel, except for heavy vehicles with a height of 5.00m and a width of 3m (exceptional transports) and ADR transport, all others are allowed to circulate. The renovation works of the San Lorenzo tunnel, in the direction of Pamplona, ??which are expected to start in the second half of May, will last approximately 4 months. During this period, tunnel safety shall be provided by a monitoring and control center and a first-aid team of firefighters, on a 24-hour and 7-day-a-week basis.
	 
	Navarra: Works in the tunnels of Belate and Almandoz condition transit in the Port of Belate
	 
	The traffic of heavy and light vehicles in the Port of Belate will be limited during daytime hours during the works in the Belate and Almandoz tunnels.